{"id":35030,"date":"2022-12-19T13:55:18","date_gmt":"2022-12-19T18:55:18","guid":{"rendered":"https:\/\/www.jackjaffa.com\/?p=35030"},"modified":"2023-01-25T22:22:06","modified_gmt":"2023-01-26T03:22:06","slug":"end-of-the-year-2022","status":"publish","type":"post","link":"https:\/\/www.jackjaffa.com\/end-of-the-year-2022\/","title":{"rendered":"End of the year 2022"},"content":{"rendered":"
[vc_row][vc_column][vc_column_text]JJ Blog-End-of-Year Deadlines<\/strong><\/p>\n \u2018Tis the season of the endless to-do lists! Between the gift shopping, cooking for the holidays, and the million other tasks you need to tend to before year\u2019s end, the days are packed. And as you wrap up the year, don\u2019t forget your end-of-the-year compliance deadlines. Make sure to remember to file all the paperwork and schedule all the inspections necessary before the end of the year.<\/p>\n Stressing over which tasks you need to do before the New Year? No worries\u2014we\u2019ve done the legwork for you! Below, we\u2019ve compiled a comprehensive list of all the year-end deadlines so you can see exactly what you need to do before the old year blows out and the new one blows in.<\/p>\n <\/p>\n 1.\u00a0 \u00a0File your annual bedbug report<\/strong><\/p>\n The last day to file your building\u2019s annual bedbug report is Dec. 31<\/strong> of each calendar year. The report will cover the period of 11\/1\/21 through 10\/31\/22 and can be filed anytime from 12\/01\/22 through 12\/31\/22.<\/p>\n Here\u2019s how it\u2019s done:<\/p>\n <\/p>\n 2.\u00a0 \u00a0File your annual elevator and boiler inspections<\/b><\/b><\/p>\n Dec. 31<\/b> is the last day to file your annual elevator and boiler inspection with the DOB NOW: Safety DOB. All high-pressure and low-pressure boilers must be inspected annually, and reports must be submitted to the DOB within 14 days after the inspection. Elevators must have periodic inspections as well, and Category 1 tests at any time throughout the year. The annual inspections, periodic inspections and Category 1 tests must be performed by Dec. 31, 2022. Reports for the periodic inspection must be submitted to the DOB within 14 days of the test, and reports for the Category 1 test must be submitted within 21 days of the test.\u00a0<\/span><\/p>\n If you haven\u2019t had your elevators and boilers inspected yet, make sure you schedule your inspection today!<\/span><\/p>\n <\/p>\n 3.\u00a0 \u00a0Inspect your buildings for allergen hazards and pests<\/b><\/b><\/p>\n NYC property owners are required by law to perform indoor allergen hazard investigations by <\/span>Dec. 31<\/b> of each year.\u00a0<\/span><\/p>\n Here\u2019s what that means for you.<\/span><\/p>\n <\/p>\n 4.\u00a0 \u00a0Perform a lead-paint inspection\u00a0<\/b><\/p>\n Dec. 31 <\/b>is the final day for performing the required annual lead-paint inspection. In addition, below is a list of all your lead-based paint requirements for the year.\u00a0<\/span><\/p>\n <\/p>\n 5.\u00a0 \u00a0S<\/strong>ubmit EER for\u00a0 buildings due in 2022 on the covered building list<\/b><\/b><\/p>\n Dec. 31 <\/b>is the final day to submit the EER for all buildings on the 2022 covered building list. This includes all buildings of 50k square feet with the last digit of 2 in the building\u2019s tax block number. You can find the complete list of covered buildings <\/span>here<\/span><\/a>. If your building is on this list, be sure to submit your EER to the DOF before the end of the year.\u00a0<\/span><\/p>\n <\/p>\n 6.\u00a0 \u00a0Perform a gas piping inspection<\/b><\/p>\n Dec. 31 <\/b>is the final day to perform a gas piping system inspection or submit certifications to the DOB for Community Districts 2, 5, 7, 13, and 18 in all boroughs. Gas piping systems must be inspected annually in all multi-family buildings. Inspections must be performed by a Licensed Master Plumber (LMP) or a qualified individual working with a LMP.\u00a0<\/span><\/p>\n Make sure to cross this task off your to-do list before the end of the year.<\/span><\/p>\n <\/p>\n\n
\n
\n